Gate Expansion – Harry Reid International Airport

Completed in 2017, the expansion of the Terminal 3 tunnel includes a 995-foot passenger circulation corridor underneath the tarmac. Our mechanical design provides two zones of comfort cooling and smoke control through a new air handling unit and VAV system within the tunnel. We also designed a new chilled water supply and return line from the T3 central plant that delivers chilled water to the new and existing northeast wing of the D Gates’ air handling units. The low voltage design for this expansion includes IT design services for three new IDF rooms, door security, and CCTV security.

Location

Las Vegas, Nevada

Project Size

30,000 sq ft